With environmental awareness and a holistic approach, Prime Power Systems Holding is currently developing a modern residential park in the inner city of Dresden.
The seven residential buildings will offer space for 240 apartments and will include an underground car park that will provide charging points for electric vehicles. In addition, a seminar building and therapeutic health center including pool facilities will be built on the site. The Energy Architects of EA Systems Dresden GmbH supported the PPS Holding by means of model-based calculations of different energy supply variants. The preference variant is a local heating supply with CHP and PV systems for an optimal balance between investment and operating costs. More detailed information on the project can be found in the following video.
Valid Energy Supply Concepts
- Demand and load forecasts
- Annual cooling load and demand
- Annual heating load and demand
- Comparison of the different supply concepts
- Overall comparison of CO2 footprint
- Overall comparison of primary energy demand
- Overall comparison of energy, operating and investment costs
- Price increase (inflation) and maintainance costs
General Economic Conditions
- Remuneration & duties according current legal regulations
- KWK-G
- EEG
- StromNEV
- Prices and overhead growth rates
- Power
- District heating
- Natural gas
- Maintainance costs and insurance